JOB.NO. NAME OF THE PROJECT CLIENT / MAIN CONTRACTOR STARTING DATE COMPLETION DATE CONTRACT VALUE
1809 Pavement Works (Ex-Plant) Dukhan Road Project QD - SBG 1-Nov-18 26-Aug-21 46,767,500.00 QR
1808 Construction of Al Bustan Street South Project (QABU) HYUNDAI ENGINEERING & CONTRACTING CO. LTD. 10-Jul-18 15-Jul-21 247,324,215.94 QR
1801 Construction of Additional Road (QN90-P025 Connection Road) (TEK-354-SC-0073) TEKFEN 17-Jan-18 2-Jun-20 11,607,446.90 QR
1715 PWA/GTC/022/2017/L - Roads and Infrastructure in Doha Industrial Area - Package 4 (QS001-P04) (Project ID - IA 2017 C 052 G). Contract No. C 2017/119 PWA 24-Dec-17 31-Oct-21 433,261,124.39 QR
1714-G PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Zonal Framework Contract for Road Maintenance Qatar Doha South Area 1 and 2 ZF_019. Contract No. C2019/14 PWA 1-Dec-19 23-May-21 34,555,540.81 QR
1714-F PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Zonal Framework Contract for Road Maintenance at Umm Bab and Other Locations ZF_013. Contract No.C2019/136 PWA 3-Nov-19 25-Apr-21 34,553,272.05 QR
1714-E PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Upgrading of Vehicle Restrained System Throughout Qatar ZF_036. Contract No. C2019/121 PWA 1-Oct-19 30-Nov-20 28,823,123.76 QR
1714-D PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Handover Expressways - Package 2 ZF_009. Contract No. C2019/46 PWA 28-Apr-19 16-Aug-20 14,398,349.35 QR
1714-C PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Upgrading Proposal for Bridge Parapet ZF_016 Contract No. C2019/28 PWA 17-Mar-19 23-Dec-19 30,936,449.40 QR
1714-B PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Rehabilitation Works for Al Hitmi and Ain Khaled Area ZF_015. Contract No. C 2019/20 PWA 27-Jan-19 24-Feb-19 16,009,756.17 QR
1714-A PWA/gtc/019/2017 - Zonal Framework Conrtact for Road Maintenance Qatar PWA 2-Sep-18 30-Oct-20 21,221,643.42 QR
1712 PWA/GTC/031/2017/L - P007-C3 Interim Construction and Upgrade of Al Rayyan Road Phase 3 (Project ID - IA 2017 C 043 I) Contract No. C2017/82 PWA 25-Sep-17 29-Nov-18 125,284,326.59 QR
1709 Roads and Infrastructure in North of Al Nasiraiyah – Package 02 – Main Infrastructure (DN108-P02) Project ID: IA 2017 C 028 G. Contract No. C2017/79 PWA 20-Aug-17 14-Apr-21 281,911,731.82 QR
1708 Utility Diversion Works of Potable Water (PW) Line at Section 2 and 4 & Treated Sewage Effluent (TSE) Line at Section 2, 3 and 4(TEK-354-SC-0032) TEKFEN 29-Jul-17 31-Jul-20 154,664,479.51 QR
1704 Microtunneling for Storm Water - Al Khor Expressway(TEK-354-SC-0010) TEKFEN 18-Apr-16 31-Jul-20 213,030,478.96 QR
1701 Roads and Infrastructure In Doha Industrial - Package 1 (IA 13/14 C 005 ST) QTCG-MSF.SC.018.00 In accordance with Main Contractor's Program 24-Dec-18 91,941,806.00 QR
1609 GTC769/2015 Three Years Call Off Contract for Service Connection in Existing Distribution Network & Field Services Department KAHRAMAA 19-Sep-16 18-Mar-21 46,818,119.20 QR
1604 Sub-Contract Number: CHEC/CEC/SC034 Project Name : Asphalt Works for Construction of East corridor P011 (Package 2) CHINA HARBOUR ENGINEERING COMPANY LTD. (CHEC) 28-Jul-16 31-Oct-16 42,501,426.47 QR
1602 Sub-base, Road base and Asphalt Works LARSEN & TOUBRO LIMITED AND AL SRAIYA TRADING & CONTRACTING - JV 14-Feb-16 12-Aug-18 224,651,960.45 QR
1501 MRPSC/029/2014-2015/L - Roads Infrastructure for Government Residential Division Project in North Al Wukair (Project Code: IA 14/15 C 057 ST). Contract No. C 2015/14 PWA 7-Jun-15 10-Jan-19 656,546,255.20 QR
1409 NPP/0047 - Centralized Customs Inspection Area - Conditional Acceptance and Notice to Proceed (CP-CDC) NEW PORT PROJECT STEERING COMMITTEE 14-Oct-14 9-Sep-16 862,800,000.00 QR
1408 GTC 611/2013 Transmission of Pipelines for Mega Reservoirs (JV CAT) KAHRAMAA 9-Sep-14 14-Apr-20 1,290,818,835.84 QR
1406 GTC 556/2013, Three (03) Years Call-off Contract for Maintenance, Replacement and Upgrading of Water Networks KAHRAMAA 2-Jul-14 1-Apr-20 166,070,496.71 QR
1401 MRPSC/008/2012-2013/L - Construction and Upgrade of Al Rayyan Road Project 7 : Contract 1 West of New Rayyan R/A to East of Bani Hajer R/A (Project ID IA 12/13 C 057 ST) .Contract No. C 2013/88 PWA 16-Feb-14 28-Oct-18 707,500,000.00 QR
1205 P003 Lusail Expressway Project / Qatar (Road and Utility Works) HYUNDAI 22-May-12 1-Apr-20 606,522,768.00 QR
1801 Construction of Additional Road (QN90-P025 Connection Road) TEKFEN 17-Jan-18 2-Jun-20 11,607,446.90 QR
1713 Earthworks of Section 1 – Supply & Transportation of Fill Material and Sub-base Works. TEKFEN 21-Nov-17 30-Nov-18 38,332,236.36 QR
1710 MANATEQ Zone (QEZ-3) Package 3.1A and 3.1 B Asphalt Works BCC-SCA-127-STRUKTON-J1710-2017 25-Jul-17 24-Oct-17 4,810,555.09 QR
1706 Utility Diversion Works of Potable Waterline at Section 3 TEKFEN 24-Apr-17 31-Jul-20 16,257,257.49 QR
1705 Construction of Temporary Traffic Management Package 1 Stage 2 and Package 2A Stage 1 (TTM2) TEKFEN 25-Apr-17 26-Mar-18 43,358,662.80 QR
1703 Construction of Khalifa Street and TV Roundabout Upgrade PWA 1-Apr-17 1-Jan-19 140,114,207.38 QR
1702 AL Khor Expressway - Design and Build of Al Khor Expressway - Temporary Road Diversion Phase - 1 TEKFEN 19-Dec-16 26-Mar-18 19,737,700.35 QR
1611 Grading and Temporary Roads for the New Temporary Labor Accomodation - Package 04 Project Code: IA 2016 C 030 G PWA 12-Feb-17 9-Oct-17 25,917,142.75 QR
1610 PWA/GTC/034/2016 - RIW Out of Greater Doha Access Road to Farms and Villages Phase 4 (IA 2016 C 026 G) PWA 15-Dec-16 14-Dec-18 74,616,794.65 QR
1608 Construction and Upgrading of Infrastructure of Al Muntazah Street Extension and Construction of Ashghal Road behind Barwa Commercial Avenue - ITS Works AL JABER TRANSPORT & GENERAL CONTRACTING LLC 7-Feb-17 31-Aug-18 109,807,994.00 QR
1606 Levelling and Grading Works for the Fifth Precinct (Agreement No.: TDO-16-TTC-0016) SUPREME COMMIITTEE FOR DELIVERY & LEGACY 25-Jul-16 6-Mar-17 29,760,599.50 QR
1605 Road Safety Improvement Program, Stage 2A (AA-R 14-15 OM 045 C1 G)- PWA/GTC/059/2014-2015/L/R1 PWA 8-Aug-16 30-Dec-18 77,308,958.28 QR
1603 Works - Construction - Design and Build - Aircraft Parking - Subcontract Agreement for Crushed Aggregate and Cement Treated Sub-base Course Works M/S. SIX CONSTRUCT QATAR LIMITED WLL (SIXCO) 22-May-16 15-Feb-17 25,724,947.72 QR
1601 Bypass from Rawdat Rashed Village to Umm Garn - Package 3(Project Code IA 14/15 C 101 ST) - MRPSC/035/2014-2015/L PWA 1-May-16 31-Dec-17 361,106,145.25 QR
1508 Subcontract Works for Cement Treated Base Course Road Works LARSEN & TOUBRO LIMITED 27-Dec-15 10-Jan-17 9,929,810.00 QR
1505 Supply and Lay of Asphalt Bas Course, Intermediate Course, Prime Coat and Tack Coat at Birkat Al Awamer, Package 3 SOLID GENERAL CONSTRUCTION When Directed by Contractor in accordance with Project Programme 18-May-16 36515817.23
1503 Roads and Infrastructure in Wakrah West, MMUP Ph. 2, PKG 14(Package 1) LANE-SOLID-TADMUR When Directed by Contractor in accordance with Project Programme 6-Jul-17 14,010,892.71 QR
1502 Maintenance of Ras Laffan Water Transmission mains, Package 1 & 2 - GTC 692/2014, KAHRAMAA 14-May-15 13-May-18 83,996,776.02 QR
1411 EARTHWORKS FOR QEZ-1 -Contract No: EZ01-CW01-CON-14 ECONOMIC ZONES COMPANY (MANATEQ) 13-Nov-14 12-Apr-16 193,976,778.54 QR
1410-B Access Road to BIRKAT AL AWAMIR [Project ID: (IA 14-15 C 068 G)-PWA/GTC/049/2014-2015/L PWA 15-Feb-15 8-Dec-15 53,319,306.88 QR
1410 Roads and Infrastructure in Birkat Al Awamer (Package 1A& 1B) - Advance Grading & Temporary Roads (QS 028-P01 A&1B) - Project Code (IA 14/15 C 083 ST) PWA 1-Dec-14 25-Mar-16 329,847,708.40 QR
1405 Link Road from SIMAISMA to South East of DAAYEN - PWA/GTC/056/2013-2014/L PWA 12-Jul-14 8-Sep-15 67,572,976.21 QR
1404 Hamad International Airport - North Cargo - Area 1-10 - Asphalting & Concreting Works QATAR AIRWAYS 22-Apr-14 31-May-14 7,719,870.18 QR
1403 QEZ3, New Port Project, Qatar, Crusher Plant Operation Works HYUNDAI 22-Apr-14 31-Dec-15 1,621,440.50 QR
1402-B Design and Build of KMW - Qatar Training Centre, Qatar Armed Forces Base, Duhailiyat DOMOPAN QATAR WLL 15-Feb-15 24-Jul-16 6,804,675.49 QR
1402 New Tank Regiment Camp at Duhailiyat - Phase 1 (E-203-02) DOMOPAN QATAR WLL 27-Jan-14 31-Aug-16 89,694,092.77 QR
1310 RIW for junctions & Roundabouts in various Areas of Greater Doha Zone 1 to 68, Phase [Contract No. C2013-79]- PWA/GTC/042/2013-14/L PWA 1-Jan-14 31-Dec-15 105,567,078.48 QR
1309-C Construction Services for Research and Development Complex - Phase 1 - Supply & Installation of Earthwork, Asphalt Works & Kerbs at New Site Office Car Park Area - QF/PD/13/M-009-MOF REDCO CONSTRTRUCTION ALMANA 11-Nov-13 3-Jan-16 33,028.21 QR
1309-B Construction Services for Research and Development Complex - Phase 1 - Supply & Installation of Earthwork, Asphalt Works & Kerbs at New Site Office Car Park Area- QF/PD/13/M-009-MOF REDCO CONSTRTRUCTION ALMANA 11-Nov-13 3-Jan-16 553,246.54 QR
1309-A Construction Services for Research and Development Complex - Phase 2- QF/PD/13/M-009-MOF REDCO CONSTRTRUCTION ALMANA 11-Nov-13 3-Jan-16 450,425.32 QR
1308 QEZ3, New Port Project, Qatar– Temporary Access Road HYUNDAI ENGINEERING & CONTRACTING CO. LTD. 1-Nov-13 20-Feb-14 18,425,406.00 QR
1306 EPIC for Temporary Improvement to Northern Section of Existing Sealine Road in Mesaieed - GC13102200 QATAR PETROLEUM 9-Sep-13 30-Jul-15 57,393,158.68 QR
1305 Earth Works for Mega Reservoirs at Al Thumama (Package 2) - GTC 542/2012 KAHRAMAA 3-Sep-13 2-Jul-14 56,559,632.30 QR
1304 Doha Expressway (Package 6) - East Industrial Road Interchanges at Intersections with Street 10 and Street 23 - Permanent Road Works SINOHYDRO GROUP LIMITED 7-Jun-13 31-Aug-16 51,283,154.92 QR
1303 Asphalt Works for Dukhan Road Project - East Contract -DUK-NAF-AW-001 QD-CPC 1-Jun-13 31-Dec-14 12,907,808.30 QR
1302 Construction of MURAIKH Area Sewerage Phase 4 (Package A) [Project IDIA 12-13 C 004 G] - PWAGTC0542012-2013 PWA 1-Jul-13 24-Jul-14 13,770,839.76 QR
1301 Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar - Contract 5 [Project ID : AA-R 11-12 M 006G) - PWA/GTC/004/2012-2013 PWA 1-Apr-13 31-Mar-15 47,670,595.25 QR
1206 Upgrading of Exisiting Route 55 Single Carriageway Connecting Doha to Umm Saieed (Project ID : LA 12-13 U 013 G) - PWA/GTC/00312-13/L PWA 12-Aug-12 24-Jul-13 112,148,809.94 QR
1204 (Water) Extension of Distribution Network at Doha Vicinity (Package 4) - GTC/437/2011 KAHRAMAA 6-May-12 15-May-16 178,240,831.73 QR
1203 Tender No. : GT11113100 EPIC for Road Upgrade from Zekreet Interchange to Ministry of Education Office/ Contract number GC11113100 QATAR PETROLEUM 26-Apr-12 29-Dec-15 27,876,844.48 QR
1201 P347 / Qatar Foundation Offsite Warehouse at Industrial Area - Road Works & Hard Landscaping CONSTRUCTION DEVELOPMENT CO. 1-May-12 1-Jun-16 5,130,420.51 QR
1150-2 Provision of Road Markings in Outer Doha (AA10/11RM055-I) -PWA/ITC/023/2010-2011/L PWA 3-Jul-11 2-Jan-13 1,828,102.19 QR
1150-1 Provision of Road Markings in Grater Doha (AA10/11RM054-I)-PWA/ITC/024/2010-2011/L PWA 3-Jul-11 2-Jan-13 2,172,575.00 QR
1108 Works - Construction - New Six Bay East Apron - Upgrade Works - Contract No. QTR-CNT-2011-1758 QATAR AIRWAYS 4-Oct-11 31-Jan-12 47,997,182.50 QR
1108-A Construction - New Six Bay East Apron - Upgrade Works - DIA /QTR-CNT-RFT-2011-038 QATAR AIRWAYS 4-Oct-11 9-May-12 2,285,334.00 QR
1106 Traffic Flow Improvement Works at Various Locations in Qatar - Project Code (AMA 10-11 M 009 G)-PWA/GTC/072/2010-2011 PWA 17-Jul-11 15-Jul-13 44,902,428.00 QR
1105 (3) Years Call-off Contract for Service Connections for 15mm to 400mm in Existing Distribution Network (Supply and Installation)- GTC-386/2010 KAHRAMAA 23-May-11 22-Nov-14 43,906,819.50 QR
1104 Design, Procurement & Construction of Asphalt Storage Areas - Contract No. QAL-LGC-0082 QATAR ALUMINUM LTD. CO. 20-Apr-11 9-Jul-11 8,395,528.00 QR
1103 Conversion of TADAMOUN and MALL R/A to Signalized Junction [Project Code IA10-11 C 140G]- PWA/GTC/075/2010-2011/DO PWA 22-May-11 19-Jul-12 59,565,816.00 QR
1102 Three Years Call off Contract for Extension of Water Distribution Mains & Services Connections (Supply & Installation) - GTC-343/2010 (3) KAHRAMAA 12-Apr-11 11-Jul-14 42,484,888.00 QR
1101 Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar ERM 1030 C1 - Contract 1 - PWA/GTC/042/2010-2011 PWA 1-Mar-11 30-Oct-12 31,124,508.00 QR
1014 Extension of Distribution Network at Doha & Vicinity (Phase IV) Package 1 - GTC346/2010 KAHRAMAA 6-Jan-11 5-Dec-13 105,377,932.00 QR
1013 Three (3) Years Call-Off Contract for Reinstatement Works in roadways and Pavements at Various Location-GTC334/2010 KAHRAMAA 10-Oct-10 9-Jan-14 6,799,270.00 QR
1012 Development ofRoads in Block 1300 (RA 09-10 C 081 G) -PWA/GTC/042/2009-2010 PWA 3-Oct-10 7-Jun-13 228,936,192.20 QR
1011-E Temporary Road Diversion Work Near QAPCO Near Gate -1 QAPCo NA NA 94,953.00 QR
1011 Construction of New Road along Corridor between QAPCO and QAFAC and paving for Truck parking, Car parking and contractor yard[Contract Ref. No. 110401087] - (Job no. 1011-C) + (Job no. 1011-D) QAPCO 28-Jun-10 28-Feb-11 19,516,865.88 QR
1011 Construction of New Road along Corridor between QAPCO and QAFAC and paving for Truck parking, Car parking and contractor yard + Parking Bays and New Car Park Area(Old Job # 1011-A)+Parking Bays and New Car Park Area + (Old Job # 1011-B) QAPCo 22-Jun-10 1-Mar-13 8,332,964.70 QR
1010 Replacement of Primary and distribution Networks at Doha & Vicinity - Phase III - GTC 305/2009 KAHRAMAA 17-Jun-10 7-Oct-13 161,909,522.00 QR
1009 Improvement of Traffic Flow in Various Areas of Greater Doha - Zone 1 to 68 (RA 09-10 C 085 G) [IBN SINA] - PWA/GTC/034/2009-2010 PWA 1-Jul-10 7-Nov-12 44,687,119.00 QR
1008 New Arrival Terminal at DIA - Package 3 - External Works ARABIAN MCNAMARA CONRTACTING 27-Mar-10 20-Oct-10 13,255,733.00 QR
1006 Road Improvement Works in Al Khor and Al Dhakhira Municipality - Zone 74 and 75 (RA09-10 C 082G) - PWA/GTC/033/2009-2010 PWA 4-May-10 3-May-11 17,480,114.00 QR
1005 Road Improvement Works in Zone 56, 57 and Doha South (RA 09-10 C 086 G) - PWA/GTC/043/2009-2010 PWA 15-Mar-10 30-Jul-12 84,142,680.00 QR
1004 Qatargas 3&4 Development Projects LNG Onshore Facilities (QCS) CTJV 5-Feb-10 30-Jul-10 16,247,479.00 QR
1003 MC A1 & MC B1 Services Road at Dukhan Highway - West Contract- PWA/GTC/062/2009-2010 PWA 7-Mar-10 6-Nov-10 40,178,602.80 QR
1002 Road Pavement Technology site Trial [Project Code ; IA 09-10 C 090G] - PWA/GTC/059/2008-2009/R1 PWA 15-Feb-10 5-Sep-10 5,689,540.00 QR
1001 Resurfacing of Asphalt Surface on the Driveway and Unpaved Areas within Doha International Airport Vicinity QATAR STEEL 21-Dec-09 11-May-10 5,141,628.87 QR
916 Industrial Interchange Doha Expressway - Package 3 [For Road Works Furousiya Road & Frontage Roads] - ERC 1400/D20/C2 KONSTRUKTOR- ENGINEERING D.D. 7-Dec-09 28-Mar-10 4,207,960.00 QR
915 Doha Expressway (Package 1 & 2) at 22nd February Street and Al Amir Street Upgrade and Interchanges PWA 12-Sep-09 25-Dec-09 2,500,000.00 QR
914 Contract No. GC09103600 - Road Work Construction at Various Locations within Gas Operations Areas (GC09103600) QATAR PETROLEUM 15-Nov-09 14-Jul-12 84,990,000.00 QR
913 Execution of Remaining Works for Doha Expressway (Package 1 & 2) at 22nd February Street and Al Amir Street Upgrade and Interchanges (PART -3) PWA 1-Nov-09 20-Sep-10 57,135,390.00 QR
912 Road Improvement Works in Muaither West Area [RA 09-10 C 070 G]- PWA/GTC/015/2009-2010 PWA 15-Nov-09 23-Nov-12 26,667,640.00 QR
911 Road Improvement Works - Construction of Roundabout at Ummsaed Wakrah Road Near Jabel Anter (PWA/ITC/008/2009-2010) Project Code : (RA 09-10 C001 I) - PWA/GTC/020/2009/2010 PWA 4-Oct-09 13-Jun-10 6,300,000.00 QR
910 Execution of Remaining Works for Doha Expressway (Package 1 & 2) at 22nd February Street and Al Amir Street Upgrade and Interchanges (PART -2) PWA 1-Nov-09 1-Feb-11 89,912,932.00 QR
909 ERC 1400/D20/C2 Industrial Interchange Doha Expressway - Package 3 [For Waterworks, Surface Water & Drainage & Sever Works] KONSTRUKTOR- ENGINEERING D.D. 5-Sep-09 25-Mar-11 32,498,927.00 QR
908 ERM 1023C3 - Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar Contract 3 [Project Code: AMA 08-09 M 003 G] PWA 15-Sep-09 30-Mar-11 28,449,025.00 QR
906 Car Parking at Administration Building Premises QATAR UNIVERSITY 15.07.09 27.07.2010 8,600,000.00 QR
905 Mowasalat Staff Accommodation - Package II - Road Works & Road Markings AL SRAIYA TRADING & CONTRACTING CO. 5-Apr-09 1-Oct-09 14,870,881.00 QR
904 Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar Contract 1 [Project Code : AMA 08-09 M 001G] - PWA/GTC/021/2008-2009 PWA 5-Mar-09 12-Mar-10 37,321,600.00 QR
903 Doha West Sewage Treatment Works Ext. No. 3 - Road Works GULF TRADING 15-Jan-09 15-Jun-09 10,375,095.00 QR
902 ABM Military College Package -2 [Asphalt Work] JANA TRADING CONTRACTING & TRANSPORTATION 1-Feb-09 N/A 9,198,060.20 QR
901 Construction of Car Parking at Swimming Pool Premises QATAR UNIVERSITY 22-Feb-09 24-Apr-09 1,937,467.37 QR
825 Extension of Distribution Network at Doha Vicinity - Phase II - GTC 229/2008 KAHRAMAA 29-Oct-08 30-Apr-11 414,576,558.57 QR
824 Call off contract for Road Crossing and Reinstatement Works in Roadways and Pavements - GTC/209/2008 KAHRAMAA 23-Aug-08 23-Feb-11 5,562,000.00 QR
823 Contract for Construction of Asphalt Road for Slag Dumping Platform and GASAL Road Near NG Station - CON-TDR-132/02/2008 QATAR STEEL 1-Sep-08 15-Apr-09 3,262,934.00 QR
822 Road Works for "L" Shape Road Phase 1 A QATAR UNIVERSITY 1-Sep-08 14-Mar-09 10,497,836.00 QR
821 Miscellaneous External Services, Road Marking and Sign Board Services at Ras Laffan Industrial city - GC 08100100 QATAR PETROLEUM 1-Jul-08 17-Jul-13 11,472,900.00 QR
820 Doha Urban Pipeline Relocation Project - GTC 06/200/ED PUNJ LYOYD 25-Jun-08 N/A 6,799,040.00 QR
819 Salwa International Highway - ITS Ducts TRAFFIC TECH 19-Jun-08 N/A 7,585,400.00 QR
818 Barwa Al Khor Development Project, Site Grading Works - Phase - 1.Contract No. B003/CON-BAK/08 BARWA AL KHOR 16.06.08 28.02.2009 81,500,000.00 QR
817 Conference Road Construction - ERC/1400/D3/C1 - West Bay Zone 33 & 60 - 68, Roads Works and Infrastructure - Tower Zone - 60 North PWA 19-Jun-08 25-Jun-09 19,000,000.00 QR
816 GSE Road Widening at Doha International Airport QATAR AIRWAYS 6-Feb-08 12-Jul-08 24,521,454.00 QR
815 Asphalt Road Works at Ras Gas Common Offplot Project Ras Laffan - Qatar NASSER S. AL-HAJIRI CO. 4-May-08 N/A 11,372,179.00 QR
814 Two [2] Years Call-off Contract for Reinstatement Works in Roadways and Pavements at Various Location- GTC 174/2007 KAHRAMAA 21-May-08 20-May-10 7,515,450.00 QR
812 Supply & Lay of Asphalt Materials MEMAR TRADING 23-Mar-08 N/A 24,915,370.00 QR
811 Reconstruction, Rehabilitation & Maintenance of Roads within Northern Area - RA07-08 M004G- PWA/GTC/049/2007-2008 PWA 9-Mar-08 31-Dec-09 20,066,725.00 QR
810 RIW in Muaither Major Roads Remaining Works - RA-07-08 C 031G - PWA/GTC/024/2007-2008 PWA 15-Jun-08 14-Jul-09 10,122,347.00 QR
809 RIW in Doha South RA 07/08 C 046G - PWA/GTC/041/2007-2008 PWA 10-Feb-08 30-Jul-09 24,344,040.00 QR
808 RIW In Doha North RA 07/08 C 047G -PWA/GTC/038/2007-2008 PWA 10-Feb-08 21-Jul-09 13,825,200.00 QR
806 RIW Out of Greater Doha Zones 72, 73 & From 80 To 86 RA/07/08/C044 G - PWA/GTC/037/2007-2008 PWA 10-Feb-08 24-May-09 7,974,450.00 QR
805 Reconstruction, Rehabilitation & Maintenance of Roads within Rayyan Municipality Area - ERM 1022C2 - RA07-08M 002G - PWA/GTC/035/07-08 PWA 29-Jan-08 30-May-09 14,252,125.00 QR
804 Rehabilitation Work - Section of Ring Road QATAR UNIVERSITY 22-Jan-08 30-Nov-08 8,800,000.00 QR
803 RIW in Khor Municipality Zone 74 & 75 (RA 07-08 C 030 G) - PQA/GTC/019/2007-08 PWA 10-Dec-07 10-May-09 11,869,400.00 QR
802 RIW in Al Wakrah Municipality Zone 90 (RA 07-08 C 029 G) - PWA/GTC/020/2007-08 PWA 10-Dec-07 17-Feb-09 6,990,000.00 QR
801 [Limited] Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar RS/07-08M 005 G - PWA/GTC/033/2007-08 PWA 4-Dec-07 15-Apr-09 9,847,875.00 QR
703 Salwa International Highway Project - Completion of Package One Works (13+225 to 30 + 000) PWA 18-Apr-07 21-Feb-09 261,516,670.00 QR
702 Construction of the remaining Works for Crushed Stone Import Facilities Roads & Bridges - Mesaieed- GTC/06/195/ED AL HUDA ENGINEERING 11-Apr-07 31-Dec-07 14,000,000.00 QR
701 UMRM Maintenance Contract 2006 - 2007 Umm Salal Municipality (Zone 71) [2007-2006/59] M.M.A.A 12-Feb-07 7-Jan-08 6,564,700.00 QR
614 ERM 1021/C5 - Reconstruction, Rehabilitation and Maintenance of Roads within Industrial Area - PWA/GTC/026/06-07 PWA 20-Dec-06 15-Feb-08 - QR
613 ERM 1021/C4 - Reconstruction, Rehabilitation and Maintenance of Roads within Northern Area - PWA/GTC/025/06-07 PWA 20-Dec-06 31-Dec-07 - QR
612 ERM 1021/C3 - Reconstruction, Rehabilitation and Maintenance of Roads within Wakrah Municipality Area - PWA/GTC/024/06-07 PWA 20-Dec-06 31-Mar-08 - QR
611 Road Maintenance Contract - Al Daayen Municipality (Zone70; 74) - TMRM2006/C1 - M.M.A.A 1-Feb-07 31-Jan-08 - QR
610 Provision of Water Network at Doha & South Qatar Areas - Phase 1 - GTC 127/2006 KAHRAMAA 18-Sep-06 20-Dec-09 - QR
609 Provision of Water Network at Doha & North Qatar Areas - Phase 1 - GTC 115/2006 KAHRAMAA 21-Aug-06 29-Mar-10 - QR
608 Asphalt Paving Works for Ministry of Interior at Various Locations ED-594-A MINISTRY OF INTERIOR 1-Nov-06 31-Oct-07 - QR
606 Reconstruction Rehabilitation and Maintenance of Roads within Doha Municipality Area - ERM 1021/C1 PWA 4-Sep-06 28-Oct-07 - QR
605 Reconstruciton, Rehabilitation and Maintenance of Roads within Rayyan Municipality Area - ERM 1021/C2 PWA 4-Sep-06 15-Apr-08 - QR
604 Construction of Roads at Qatar University - Tender No. 1/2006/2007 QATAR UNIVERISTY 25-Oct-07 13-Feb-08 - QR
603 Development of Roads in Zone 40 (Packages 2, 3 & 6) - ERC 1400/D6/C1 & C2 PWA 27-Jul-06 5-Mar-09 - QR
602 ERC 1400/D6/C3 - Development of Roads in Zone 41 (Package 4) PWA/GTC/108/2005-2006 PWA 20-Aug-06 13-Feb-08 - QR
601 Replacement of Water Distribution Mains at Doha & Mesaieed Industrial City- GTC 69/2005 KAHRAMAA 2-Jan-06 31-Jul-08 - QR
601 Replacement of Water Distribution Mains at Doha & Mesaieed Industrial City - GTC 69/2005 KAHRAMAA 2-Jan-06 31-Jul-08 - QR
513 The Sport City Project, Temporary Parking Facilities - KSCDC/308/05 KSCDC 24-Dec-05 26.10.06 - QR
513 The Sport City Project, Temporary Parking Facilities KSCDC/308/05 KSCDC 24-Dec-05 26-Oct-06 - QR
512 Call off agreement for the construction of Parking Areas at various locations - DAGOC/GTC/VN/090/2005 DAGOC 27-Nov-05 31-Jan-07 - QR
511 ERM 1020C2 Reconstruction, Rehabilitation & Maintenance of Roads within Rayyan Municipality - PWA/GTC/03/05-06 PWA 16-Oct-05 11-Aug-06 - QR
510 ERM 1020C2 Reconstruction, Rehabilitation & Maintenance of Roads within Doha Municipality - PWA/GTC/03/05-06 PWA 25-Sep-05 4-Sep-06 - QR
509 ERC 0624 C5 - Improvement works for Rayyan Municipality Phase II - RIW Amir & Muraikh - PWA/GTC/046/05-06 PWA 2-Oct-05 1-Oct-06 - QR
508 Road Maintenance Contract Wakrah Municipality (Zones 90, 91) - WMRM 2005/C1 MINISTRY OF FINANCE 1-Oct-05 5-Jun-06 - QR
506 Road Maintenance - (Zones 75, 76) - Contract 2 - KMRM 2005/C2 MINISTRY OF FINANCE 10-Oct-05 20-Feb-07 - QR
505 Road Maintenance - Al Khor City - Contract 1 - KMRM 2005/C1 MINISTRY OF FINANCE 10-Oct-05 20-Jan-07 - QR
504 Reconstruction, Rehabiliatation & Maintenance of Roads throughout QatarERM 1020/C4 PWA 28-Aug-05 22-Aug-06 - QR
503 NDIA - Labour Compound Infrastructure AL-JABER  ENGINEERING 2-Aug-05 31-Jan-06 - QR
502 Suhaim Bin Hamad Street & Al Shura Roundabout- PWA/GTC/022/2004-2005 - ERC 0656/C1 PWA 17-Jul-05 20-Sep-06 - QR
502 Suhaim Bin Hamad Street & Al Shura Roundabout- PWA/GTC/022/2004-2005 - ERC 0656/C1 PWA 17-Jul-05 20-Sep-06 - QR
501 Earthworks at Musaimeer Area (Zone 46 & 56) PWA / GTC/005/2004-2005: ERC 0684/C15 PWA 22-Feb-05 4-Dec-05 - QR
418 Qatar Foundation - Education City Construction of Housing Lot # 2 - Fill Materials MIDMAC CONTRACO JV 27-Nov-04 4-Sep-04 - QR
417 Widening of Jabel Road, kerbing to production Lab & pave car park for ELS Married Accommodation (Phase 1 & II) in Dukhan Fields - LTC/016/04 Q.P 25-Aug-04 15-Jun-05 - QR
416 QP Dukhan Head Quarter Building Dukhan - Road + Paving Works AL MUFTAH 2-Aug-04 31-Jul-05 - QR
415-B RIW Access Rds. to Houses in Umm Salal- ERC 0694 C1 PWA 12-Mar-02 30-Apr-05 - QR
415-A RIW Umm Salal Municipality (Zone 70&71) LTC/184/2003-2004 - ERC0729C1 PWA 1-Nov-04 31-Jan-07 - QR
413 RIW Village Roads CTC/183/2003-2004 - ERC 0728/C1 PWA 1-Dec-04 29-May-07 - QR
410 ERM 1019C5 Road Maintenance 2003/2004 - Contract 5 PWA 15-Aug-04 28-Sep-06 - QR
409 Underpass and Access Roads - Doha 2006 Asian Games Athletes' Village / Hamad Medical City AL-JABER  ENGINEERING 1-May-04 N/A - QR
J/19/02 Hard Landscaping Work for Shopping Mall (Giant Store) for Qatar Central Markets REDCO 17-Aug-02 13-Dec-02 - QR
J/18/02 Maintenance to Various Schools - Package (C) - Asphalt Works CONTRACO 11-Aug-02 25-Dec-02 - QR
J/17/02-A Earth Works, Hard Landscaping & Road Works for Preparatory & Secondary School at Bani Hajar & Muaither - Gen/715/06-2001 - Road Works LOTUS 11-Aug-02 8-Dec-02 - QR
J/14/04 Upgrade, Realignment & Construction of approach roads in the Dukhan Fields - GTC/227/FSD/03 Q.P. 2-Dec-03 30-Nov-04 - QR
J/14/02 Waste Management Facility at Ras Laffan AL-JABER  ENGINEERING 7-May-02 15-Dec-02 - QR
J/14/00 "D" Minor Maintenance 1999-2000 - Contract 1 General Highway Maintenance Work - ERM 1014 C1 M.M.A.A. 1-Jul-00 15-Nov-00 - QR
J/12/04 New Doha Int'l Airport - Site Mobilization Offices & Facilities GULF HOUSING 11-Jul-04 12-Dec-04 - QR
J/12/03 Construction and Upgrade of Track Roads for the Maintenance of 33Kv Overhead Lines within the Dukhan Fields - LTC/386/02 QATAR PETROLEUM 24-Aug-03 31-Dec-03 - QR
J/11/04 EPIC of Crushed Stone Import Facilities at Mesaieed Road Works & Other Services- GTC 179/ED/01 GANDI LAVORI FINCOSIT MIDDLE EAST WLL 1-Apr-03 3-Dec-04 - QR
J/11/02 EPIC of 30" Khulf Gas Pipeline Replacement Project Point N-B-S - GTC 104/2000 MEDGULF CONSTRUCTION CO. 23-Jan-02 30-Sep-02 - QR
J/10/03 Repair of existing Well Head Track Road & Construction of New Layouts in Dukhan Fields - GTC/154/FSD/02 AL-JABER  ENGINEERING 1-Jan-03 28-Jul-03 - QR
J/10/02 Road Track Repair at Dukhan - GTC 143/2002 Q.G.P.C. 1-Jan-01 1-Aug-02 - QR
J/09/97 Road Works at P205-R-3210-002-Camp Building at Ras Laffan CONSTRUCTION DEVELOPMENT CO. 8-Jan-97 16-Mar-98 - QR
J/09/02-A Warkrah North - Asphalt Works - ERC 409 - RIW AL SRAIYA TRADING & CONTRACTING CO. 1-Jan-02 28-Jul-02 - QR
J/08/99 RAF 'B' Distillate Mains, MEW Ref: PPW/6406A, Reinstatement of Major and Minor Roads MABANI 23-Apr-98 7-Nov-99 - QR
J/08/96 Shopping Mall at D ring road for Shk. Hassan Bin Sulthan Al-Thani Earth Work/Hard Landscaping AL-AHED CONTRACTING 26-May-96 18-Dec-96 - QR
J/08/04 EPIC of LPG Tanks & conversion of existing 2 No. propane tanks to Butane storage tanks - Mesaieed - GTC129/ED/02 SAMSUNG 25-Jan-04 3-Dec-04 - QR
J/08/03 RIW Al Wajbah Access Road to Amir Guard Army Camp - ERA 0110C7 M.M.A.A. 1-Jan-02 1-Aug-03 - QR
J/08/02-A Road Maintenance 2001-2002 - Contract 6 - ERM 1016 C6 MMAA 1-Jan-02 25-Jun-02 - QR
J/07/04 General Maintenance Works VARIOUS 1-Jan-04 8-Dec-04 - QR
J/07/02 General Maintenance Works VARIOUS 1-Jan-02 31-Dec-02 - QR
J/07/01 General Maintenance Works VARIOUS 1-Jan-01 31-Dec-01 - QR
J/06/04 Call off Contract for Civil Maintenance of Roads & Track within Dukhan Fields - GTC/199/02 Q.P. 1-Jun-03 1-Dec-04 - QR
J/06/02-B Wholesale Market Roads - ERC 0499 M.M.A.A. 7-Jan-01 8-May-02 - QR
J/06/02-A RIW - Doha West Abu Hamour Road - ERC 0101 C2 M.M.A.A. 11-Oct-00 15-Jun-02 - QR
J/05/04 Civil Works for Roads & Infrastructure - QP Hazardous Waste Treatment Centre - Mesaieed - GTC178/ED/01 AL SARYA GROUP 12-Nov-02 29-Jun-04 - QR
J/05/03 General Maintenance Works Various 1-Jan-03 31-Dec-03 - QR
J/05/02-B ERC 0694C1 - RIW Access Roads to Houses in Umm Salal M.M.A.A. 27-Jan-02 7-Jan-03 - QR
J/05/02-A ERC 0500 C1 - RIW - Ummslala Municipality Area M.M.A.A. 27-Jan-01 18-Jul-02 - QR
J/05/01 Rehabilitation of Road No. 16 Part A + B at Ummsaieed AMCON 12-Oct-00 13-Dec-01 - QR
J/04/03 Road Maintenance Work at Doha- ERC0570C1 M.M.A.A. 1-Jan-02 1-Nov-03 - QR
J/04/02 Access Roads to Qatar Water Factory - ERC 0561 C1 M.M.A.A. 27-Jan-01 26-May-02 - QR
J/04/01 Qatar Vinyl Project - Road Works C.C.I.C. 1-Jan-00 15-Jun-01 - QR
J/04/00 "B" Qatar Exhibition Centre roads - ERC 0422C1 AL-JABER CONTRACTING 1-Jan-99 20-Aug-00 - QR
J/04/00 "A" Tender for ERC 0299 C8 Road Improvement works village roads N. Village AL-JABER CONTRACTING 1-Jan-99 15-Jul-00 - QR
J/03/02 ERC 0496C1 - Access Roads to Rayyan Water Factory M.M.A.A. 20-Jan-01 31-Jan-02 - QR
J/03/01 Asphalt Work at West Bay Hotel C.C.I.C. 1-Jan-00 1-Dec-01 - QR
J/03/00 Road Improvement Works - Zone 47 "ERC 0392C2" M.M.A.A. 1-Jan-99 30-May-00 - QR
J/02/96 Road works at the Qatar Flour Mill - Doha Port AL JABER ENGINEERING 1-Aug-96 1-Dec-96 - QR
J/02/04 Al Diffaf St. Zone 38- ERC 0572 C1 M.M.A.A. 7-May-02 30-Jun-04 - QR
J/02/02-A Road Improvement Works - Muaither North & Al Wajbah-ERA 0110C3 - M.M.A.A. 11-Nov-00 6-Jun-02 - QR
J/02/01 Route 55 - Mesaieed to Salwa Road TEYSEER CONTRACTING CO. 6-May-00 12-Dec-01 - QR
J/01/99 General Works VARIOUS 1-Jan-99 31-Dec-99 - QR
J/01/99 Asphalt Work on the US Army Corps of Engineers FY 97 BILL HARBERT 1-Jan-99 18-Dec-99 - QR
J/01/98 General Works VARIOUS 1-Jan-98 31-Dec-98 - QR
J/01/97 General Works VARIOUS 1-Jan-97 31-Dec-97 - QR
J/01/96 General Works VARIOUS 1-Jan-96 31-Dec-96 - QR
J/01/04 ERC 0585 C2 - RIW in Al - Khor M.M.A.A. 1-Jun-03 21-Nov-04 - QR
J/01/00 General Works VARIOUS 1-Jan-00 31-Dec-00 - QR