Welcome to BOOMCONSTRUCTION
The Roads and Infrastructure in Doha Industrial Area – Package 4 Project is a Framework Contract for Local Roads and Drainage Programme awarded to Boom Construction by PWA on Dec 2017 to an estimated amount of Three Hundred Eighty Four Million Qatari Riyals (Qar 384,000,000.00).
The Project Roads and Infrastructure in Doha Industrial Area project covers a network of urban roadways extending for 230 km approximately, consisting of local streets, collector roads, arterial roads, as well as an expressway segment along Street 33 (extension of AlMuntazah road). The overall area of the project is 2334 Ha approximately. It may be accessed through Salwa Road from the North, Al-Muntazah/Street 33 in the center, and the proposed East-West corridor from the South. Access from East and West is made through the East Industrial Road and the West Industrial Road respectively.
The construction of the project was implemented into seven packages of comparable sizes and scope. This document addresses the fourth, fifth and seventh of these packages, approximately total of 798 hec. The objective of the project is essentially to rehabilitate and upgrade the roads and infrastructure in the Doha Industrial Area in line with future plans, while respecting existing development as much as possible. This would make the Doha Industrial Area safer, healthier, and less congested, improving the overall quality of life for its inhabitants, workers and visitors
The works include, but are not limited to the following:
The Roads and Infrastructure in Doha Industrial Area – Package 4 Project duration was estimated to be 540 days and 400 days Maintenance Period.