Welcome to BOOMCONSTRUCTION
JOB.NO. | NAME OF THE PROJECT | CLIENT / MAIN CONTRACTOR | STARTING DATE | COMPLETION DATE | CONTRACT VALUE |
1809 | Pavement Works (Ex-Plant) Dukhan Road Project | QD - SBG | 1-Nov-18 | 26-Aug-21 | 46,767,500.00 QR |
1808 | Construction of Al Bustan Street South Project (QABU) | HYUNDAI ENGINEERING & CONTRACTING CO. LTD. | 10-Jul-18 | 15-Jul-21 | 247,324,215.94 QR |
1801 | Construction of Additional Road (QN90-P025 Connection Road) (TEK-354-SC-0073) | TEKFEN | 17-Jan-18 | 2-Jun-20 | 11,607,446.90 QR |
1715 | PWA/GTC/022/2017/L - Roads and Infrastructure in Doha Industrial Area - Package 4 (QS001-P04) (Project ID - IA 2017 C 052 G). Contract No. C 2017/119 | PWA | 24-Dec-17 | 31-Oct-21 | 433,261,124.39 QR |
1714-G | PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Zonal Framework Contract for Road Maintenance Qatar Doha South Area 1 and 2 ZF_019. Contract No. C2019/14 | PWA | 1-Dec-19 | 23-May-21 | 34,555,540.81 QR |
1714-F | PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Zonal Framework Contract for Road Maintenance at Umm Bab and Other Locations ZF_013. Contract No.C2019/136 | PWA | 3-Nov-19 | 25-Apr-21 | 34,553,272.05 QR |
1714-E | PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Upgrading of Vehicle Restrained System Throughout Qatar ZF_036. Contract No. C2019/121 | PWA | 1-Oct-19 | 30-Nov-20 | 28,823,123.76 QR |
1714-D | PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Handover Expressways - Package 2 ZF_009. Contract No. C2019/46 | PWA | 28-Apr-19 | 16-Aug-20 | 14,398,349.35 QR |
1714-C | PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Upgrading Proposal for Bridge Parapet ZF_016 Contract No. C2019/28 | PWA | 17-Mar-19 | 23-Dec-19 | 30,936,449.40 QR |
1714-B | PWA/GTC/019/2017 - Zonal Framework Contract for Road Maintenance Qatar (Project ID - AA ROM 2017 203 G) - Rehabilitation Works for Al Hitmi and Ain Khaled Area ZF_015. Contract No. C 2019/20 | PWA | 27-Jan-19 | 24-Feb-19 | 16,009,756.17 QR |
1714-A | PWA/gtc/019/2017 - Zonal Framework Conrtact for Road Maintenance Qatar | PWA | 2-Sep-18 | 30-Oct-20 | 21,221,643.42 QR |
1712 | PWA/GTC/031/2017/L - P007-C3 Interim Construction and Upgrade of Al Rayyan Road Phase 3 (Project ID - IA 2017 C 043 I) Contract No. C2017/82 | PWA | 25-Sep-17 | 29-Nov-18 | 125,284,326.59 QR |
1709 | Roads and Infrastructure in North of Al Nasiraiyah – Package 02 – Main Infrastructure (DN108-P02) Project ID: IA 2017 C 028 G. Contract No. C2017/79 | PWA | 20-Aug-17 | 14-Apr-21 | 281,911,731.82 QR |
1708 | Utility Diversion Works of Potable Water (PW) Line at Section 2 and 4 & Treated Sewage Effluent (TSE) Line at Section 2, 3 and 4(TEK-354-SC-0032) | TEKFEN | 29-Jul-17 | 31-Jul-20 | 154,664,479.51 QR |
1704 | Microtunneling for Storm Water - Al Khor Expressway(TEK-354-SC-0010) | TEKFEN | 18-Apr-16 | 31-Jul-20 | 213,030,478.96 QR |
1701 | Roads and Infrastructure In Doha Industrial - Package 1 (IA 13/14 C 005 ST) | QTCG-MSF.SC.018.00 | In accordance with Main Contractor's Program | 24-Dec-18 | 91,941,806.00 QR |
1609 | GTC769/2015 Three Years Call Off Contract for Service Connection in Existing Distribution Network & Field Services Department | KAHRAMAA | 19-Sep-16 | 18-Mar-21 | 46,818,119.20 QR |
1604 | Sub-Contract Number: CHEC/CEC/SC034 Project Name : Asphalt Works for Construction of East corridor P011 (Package 2) | CHINA HARBOUR ENGINEERING COMPANY LTD. (CHEC) | 28-Jul-16 | 31-Oct-16 | 42,501,426.47 QR |
1602 | Sub-base, Road base and Asphalt Works | LARSEN & TOUBRO LIMITED AND AL SRAIYA TRADING & CONTRACTING - JV | 14-Feb-16 | 12-Aug-18 | 224,651,960.45 QR |
1501 | MRPSC/029/2014-2015/L - Roads Infrastructure for Government Residential Division Project in North Al Wukair (Project Code: IA 14/15 C 057 ST). Contract No. C 2015/14 | PWA | 7-Jun-15 | 10-Jan-19 | 656,546,255.20 QR |
1409 | NPP/0047 - Centralized Customs Inspection Area - Conditional Acceptance and Notice to Proceed (CP-CDC) | NEW PORT PROJECT STEERING COMMITTEE | 14-Oct-14 | 9-Sep-16 | 862,800,000.00 QR |
1408 | GTC 611/2013 Transmission of Pipelines for Mega Reservoirs (JV CAT) | KAHRAMAA | 9-Sep-14 | 14-Apr-20 | 1,290,818,835.84 QR |
1406 | GTC 556/2013, Three (03) Years Call-off Contract for Maintenance, Replacement and Upgrading of Water Networks | KAHRAMAA | 2-Jul-14 | 1-Apr-20 | 166,070,496.71 QR |
1401 | MRPSC/008/2012-2013/L - Construction and Upgrade of Al Rayyan Road Project 7 : Contract 1 West of New Rayyan R/A to East of Bani Hajer R/A (Project ID IA 12/13 C 057 ST) .Contract No. C 2013/88 | PWA | 16-Feb-14 | 28-Oct-18 | 707,500,000.00 QR |
1205 | P003 Lusail Expressway Project / Qatar (Road and Utility Works) | HYUNDAI | 22-May-12 | 1-Apr-20 | 606,522,768.00 QR |
1801 | Construction of Additional Road (QN90-P025 Connection Road) | TEKFEN | 17-Jan-18 | 2-Jun-20 | 11,607,446.90 QR |
1713 | Earthworks of Section 1 – Supply & Transportation of Fill Material and Sub-base Works. | TEKFEN | 21-Nov-17 | 30-Nov-18 | 38,332,236.36 QR |
1710 | MANATEQ Zone (QEZ-3) Package 3.1A and 3.1 B Asphalt Works | BCC-SCA-127-STRUKTON-J1710-2017 | 25-Jul-17 | 24-Oct-17 | 4,810,555.09 QR |
1706 | Utility Diversion Works of Potable Waterline at Section 3 | TEKFEN | 24-Apr-17 | 31-Jul-20 | 16,257,257.49 QR |
1705 | Construction of Temporary Traffic Management Package 1 Stage 2 and Package 2A Stage 1 (TTM2) | TEKFEN | 25-Apr-17 | 26-Mar-18 | 43,358,662.80 QR |
1703 | Construction of Khalifa Street and TV Roundabout Upgrade | PWA | 1-Apr-17 | 1-Jan-19 | 140,114,207.38 QR |
1702 | AL Khor Expressway - Design and Build of Al Khor Expressway - Temporary Road Diversion Phase - 1 | TEKFEN | 19-Dec-16 | 26-Mar-18 | 19,737,700.35 QR |
1611 | Grading and Temporary Roads for the New Temporary Labor Accomodation - Package 04 Project Code: IA 2016 C 030 G | PWA | 12-Feb-17 | 9-Oct-17 | 25,917,142.75 QR |
1610 | PWA/GTC/034/2016 - RIW Out of Greater Doha Access Road to Farms and Villages Phase 4 (IA 2016 C 026 G) | PWA | 15-Dec-16 | 14-Dec-18 | 74,616,794.65 QR |
1608 | Construction and Upgrading of Infrastructure of Al Muntazah Street Extension and Construction of Ashghal Road behind Barwa Commercial Avenue - ITS Works | AL JABER TRANSPORT & GENERAL CONTRACTING LLC | 7-Feb-17 | 31-Aug-18 | 109,807,994.00 QR |
1606 | Levelling and Grading Works for the Fifth Precinct (Agreement No.: TDO-16-TTC-0016) | SUPREME COMMIITTEE FOR DELIVERY & LEGACY | 25-Jul-16 | 6-Mar-17 | 29,760,599.50 QR |
1605 | Road Safety Improvement Program, Stage 2A (AA-R 14-15 OM 045 C1 G)- PWA/GTC/059/2014-2015/L/R1 | PWA | 8-Aug-16 | 30-Dec-18 | 77,308,958.28 QR |
1603 | Works - Construction - Design and Build - Aircraft Parking - Subcontract Agreement for Crushed Aggregate and Cement Treated Sub-base Course Works | M/S. SIX CONSTRUCT QATAR LIMITED WLL (SIXCO) | 22-May-16 | 15-Feb-17 | 25,724,947.72 QR |
1601 | Bypass from Rawdat Rashed Village to Umm Garn - Package 3(Project Code IA 14/15 C 101 ST) - MRPSC/035/2014-2015/L | PWA | 1-May-16 | 31-Dec-17 | 361,106,145.25 QR |
1508 | Subcontract Works for Cement Treated Base Course Road Works | LARSEN & TOUBRO LIMITED | 27-Dec-15 | 10-Jan-17 | 9,929,810.00 QR |
1505 | Supply and Lay of Asphalt Bas Course, Intermediate Course, Prime Coat and Tack Coat at Birkat Al Awamer, Package 3 | SOLID GENERAL CONSTRUCTION | When Directed by Contractor in accordance with Project Programme | 18-May-16 | 36515817.23 |
1503 | Roads and Infrastructure in Wakrah West, MMUP Ph. 2, PKG 14(Package 1) | LANE-SOLID-TADMUR | When Directed by Contractor in accordance with Project Programme | 6-Jul-17 | 14,010,892.71 QR |
1502 | Maintenance of Ras Laffan Water Transmission mains, Package 1 & 2 - GTC 692/2014, | KAHRAMAA | 14-May-15 | 13-May-18 | 83,996,776.02 QR |
1411 | EARTHWORKS FOR QEZ-1 -Contract No: EZ01-CW01-CON-14 | ECONOMIC ZONES COMPANY (MANATEQ) | 13-Nov-14 | 12-Apr-16 | 193,976,778.54 QR |
1410-B | Access Road to BIRKAT AL AWAMIR [Project ID: (IA 14-15 C 068 G)-PWA/GTC/049/2014-2015/L | PWA | 15-Feb-15 | 8-Dec-15 | 53,319,306.88 QR |
1410 | Roads and Infrastructure in Birkat Al Awamer (Package 1A& 1B) - Advance Grading & Temporary Roads (QS 028-P01 A&1B) - Project Code (IA 14/15 C 083 ST) | PWA | 1-Dec-14 | 25-Mar-16 | 329,847,708.40 QR |
1405 | Link Road from SIMAISMA to South East of DAAYEN - PWA/GTC/056/2013-2014/L | PWA | 12-Jul-14 | 8-Sep-15 | 67,572,976.21 QR |
1404 | Hamad International Airport - North Cargo - Area 1-10 - Asphalting & Concreting Works | QATAR AIRWAYS | 22-Apr-14 | 31-May-14 | 7,719,870.18 QR |
1403 | QEZ3, New Port Project, Qatar, Crusher Plant Operation Works | HYUNDAI | 22-Apr-14 | 31-Dec-15 | 1,621,440.50 QR |
1402-B | Design and Build of KMW - Qatar Training Centre, Qatar Armed Forces Base, Duhailiyat | DOMOPAN QATAR WLL | 15-Feb-15 | 24-Jul-16 | 6,804,675.49 QR |
1402 | New Tank Regiment Camp at Duhailiyat - Phase 1 (E-203-02) | DOMOPAN QATAR WLL | 27-Jan-14 | 31-Aug-16 | 89,694,092.77 QR |
1310 | RIW for junctions & Roundabouts in various Areas of Greater Doha Zone 1 to 68, Phase [Contract No. C2013-79]- PWA/GTC/042/2013-14/L | PWA | 1-Jan-14 | 31-Dec-15 | 105,567,078.48 QR |
1309-C | Construction Services for Research and Development Complex - Phase 1 - Supply & Installation of Earthwork, Asphalt Works & Kerbs at New Site Office Car Park Area - QF/PD/13/M-009-MOF | REDCO CONSTRTRUCTION ALMANA | 11-Nov-13 | 3-Jan-16 | 33,028.21 QR |
1309-B | Construction Services for Research and Development Complex - Phase 1 - Supply & Installation of Earthwork, Asphalt Works & Kerbs at New Site Office Car Park Area- QF/PD/13/M-009-MOF | REDCO CONSTRTRUCTION ALMANA | 11-Nov-13 | 3-Jan-16 | 553,246.54 QR |
1309-A | Construction Services for Research and Development Complex - Phase 2- QF/PD/13/M-009-MOF | REDCO CONSTRTRUCTION ALMANA | 11-Nov-13 | 3-Jan-16 | 450,425.32 QR |
1308 | QEZ3, New Port Project, Qatar– Temporary Access Road | HYUNDAI ENGINEERING & CONTRACTING CO. LTD. | 1-Nov-13 | 20-Feb-14 | 18,425,406.00 QR |
1306 | EPIC for Temporary Improvement to Northern Section of Existing Sealine Road in Mesaieed - GC13102200 | QATAR PETROLEUM | 9-Sep-13 | 30-Jul-15 | 57,393,158.68 QR |
1305 | Earth Works for Mega Reservoirs at Al Thumama (Package 2) - GTC 542/2012 | KAHRAMAA | 3-Sep-13 | 2-Jul-14 | 56,559,632.30 QR |
1304 | Doha Expressway (Package 6) - East Industrial Road Interchanges at Intersections with Street 10 and Street 23 - Permanent Road Works | SINOHYDRO GROUP LIMITED | 7-Jun-13 | 31-Aug-16 | 51,283,154.92 QR |
1303 | Asphalt Works for Dukhan Road Project - East Contract -DUK-NAF-AW-001 | QD-CPC | 1-Jun-13 | 31-Dec-14 | 12,907,808.30 QR |
1302 | Construction of MURAIKH Area Sewerage Phase 4 (Package A) [Project IDIA 12-13 C 004 G] - PWAGTC0542012-2013 | PWA | 1-Jul-13 | 24-Jul-14 | 13,770,839.76 QR |
1301 | Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar - Contract 5 [Project ID : AA-R 11-12 M 006G) - PWA/GTC/004/2012-2013 | PWA | 1-Apr-13 | 31-Mar-15 | 47,670,595.25 QR |
1206 | Upgrading of Exisiting Route 55 Single Carriageway Connecting Doha to Umm Saieed (Project ID : LA 12-13 U 013 G) - PWA/GTC/00312-13/L | PWA | 12-Aug-12 | 24-Jul-13 | 112,148,809.94 QR |
1204 (Water) | Extension of Distribution Network at Doha Vicinity (Package 4) - GTC/437/2011 | KAHRAMAA | 6-May-12 | 15-May-16 | 178,240,831.73 QR |
1203 | Tender No. : GT11113100 EPIC for Road Upgrade from Zekreet Interchange to Ministry of Education Office/ Contract number GC11113100 | QATAR PETROLEUM | 26-Apr-12 | 29-Dec-15 | 27,876,844.48 QR |
1201 | P347 / Qatar Foundation Offsite Warehouse at Industrial Area - Road Works & Hard Landscaping | CONSTRUCTION DEVELOPMENT CO. | 1-May-12 | 1-Jun-16 | 5,130,420.51 QR |
1150-2 | Provision of Road Markings in Outer Doha (AA10/11RM055-I) -PWA/ITC/023/2010-2011/L | PWA | 3-Jul-11 | 2-Jan-13 | 1,828,102.19 QR |
1150-1 | Provision of Road Markings in Grater Doha (AA10/11RM054-I)-PWA/ITC/024/2010-2011/L | PWA | 3-Jul-11 | 2-Jan-13 | 2,172,575.00 QR |
1108 | Works - Construction - New Six Bay East Apron - Upgrade Works - Contract No. QTR-CNT-2011-1758 | QATAR AIRWAYS | 4-Oct-11 | 31-Jan-12 | 47,997,182.50 QR |
1108-A | Construction - New Six Bay East Apron - Upgrade Works - DIA /QTR-CNT-RFT-2011-038 | QATAR AIRWAYS | 4-Oct-11 | 9-May-12 | 2,285,334.00 QR |
1106 | Traffic Flow Improvement Works at Various Locations in Qatar - Project Code (AMA 10-11 M 009 G)-PWA/GTC/072/2010-2011 | PWA | 17-Jul-11 | 15-Jul-13 | 44,902,428.00 QR |
1105 | (3) Years Call-off Contract for Service Connections for 15mm to 400mm in Existing Distribution Network (Supply and Installation)- GTC-386/2010 | KAHRAMAA | 23-May-11 | 22-Nov-14 | 43,906,819.50 QR |
1104 | Design, Procurement & Construction of Asphalt Storage Areas - Contract No. QAL-LGC-0082 | QATAR ALUMINUM LTD. CO. | 20-Apr-11 | 9-Jul-11 | 8,395,528.00 QR |
1103 | Conversion of TADAMOUN and MALL R/A to Signalized Junction [Project Code IA10-11 C 140G]- PWA/GTC/075/2010-2011/DO | PWA | 22-May-11 | 19-Jul-12 | 59,565,816.00 QR |
1102 | Three Years Call off Contract for Extension of Water Distribution Mains & Services Connections (Supply & Installation) - GTC-343/2010 (3) | KAHRAMAA | 12-Apr-11 | 11-Jul-14 | 42,484,888.00 QR |
1101 | Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar ERM 1030 C1 - Contract 1 - PWA/GTC/042/2010-2011 | PWA | 1-Mar-11 | 30-Oct-12 | 31,124,508.00 QR |
1014 | Extension of Distribution Network at Doha & Vicinity (Phase IV) Package 1 - GTC346/2010 | KAHRAMAA | 6-Jan-11 | 5-Dec-13 | 105,377,932.00 QR |
1013 | Three (3) Years Call-Off Contract for Reinstatement Works in roadways and Pavements at Various Location-GTC334/2010 | KAHRAMAA | 10-Oct-10 | 9-Jan-14 | 6,799,270.00 QR |
1012 | Development ofRoads in Block 1300 (RA 09-10 C 081 G) -PWA/GTC/042/2009-2010 | PWA | 3-Oct-10 | 7-Jun-13 | 228,936,192.20 QR |
1011-E | Temporary Road Diversion Work Near QAPCO Near Gate -1 | QAPCo | NA | NA | 94,953.00 QR |
1011 | Construction of New Road along Corridor between QAPCO and QAFAC and paving for Truck parking, Car parking and contractor yard[Contract Ref. No. 110401087] - (Job no. 1011-C) + (Job no. 1011-D) | QAPCO | 28-Jun-10 | 28-Feb-11 | 19,516,865.88 QR |
1011 | Construction of New Road along Corridor between QAPCO and QAFAC and paving for Truck parking, Car parking and contractor yard + Parking Bays and New Car Park Area(Old Job # 1011-A)+Parking Bays and New Car Park Area + (Old Job # 1011-B) | QAPCo | 22-Jun-10 | 1-Mar-13 | 8,332,964.70 QR |
1010 | Replacement of Primary and distribution Networks at Doha & Vicinity - Phase III - GTC 305/2009 | KAHRAMAA | 17-Jun-10 | 7-Oct-13 | 161,909,522.00 QR |
1009 | Improvement of Traffic Flow in Various Areas of Greater Doha - Zone 1 to 68 (RA 09-10 C 085 G) [IBN SINA] - PWA/GTC/034/2009-2010 | PWA | 1-Jul-10 | 7-Nov-12 | 44,687,119.00 QR |
1008 | New Arrival Terminal at DIA - Package 3 - External Works | ARABIAN MCNAMARA CONRTACTING | 27-Mar-10 | 20-Oct-10 | 13,255,733.00 QR |
1006 | Road Improvement Works in Al Khor and Al Dhakhira Municipality - Zone 74 and 75 (RA09-10 C 082G) - PWA/GTC/033/2009-2010 | PWA | 4-May-10 | 3-May-11 | 17,480,114.00 QR |
1005 | Road Improvement Works in Zone 56, 57 and Doha South (RA 09-10 C 086 G) - PWA/GTC/043/2009-2010 | PWA | 15-Mar-10 | 30-Jul-12 | 84,142,680.00 QR |
1004 | Qatargas 3&4 Development Projects LNG Onshore Facilities (QCS) | CTJV | 5-Feb-10 | 30-Jul-10 | 16,247,479.00 QR |
1003 | MC A1 & MC B1 Services Road at Dukhan Highway - West Contract- PWA/GTC/062/2009-2010 | PWA | 7-Mar-10 | 6-Nov-10 | 40,178,602.80 QR |
1002 | Road Pavement Technology site Trial [Project Code ; IA 09-10 C 090G] - PWA/GTC/059/2008-2009/R1 | PWA | 15-Feb-10 | 5-Sep-10 | 5,689,540.00 QR |
1001 | Resurfacing of Asphalt Surface on the Driveway and Unpaved Areas within Doha International Airport Vicinity | QATAR STEEL | 21-Dec-09 | 11-May-10 | 5,141,628.87 QR |
916 | Industrial Interchange Doha Expressway - Package 3 [For Road Works Furousiya Road & Frontage Roads] - ERC 1400/D20/C2 | KONSTRUKTOR- ENGINEERING D.D. | 7-Dec-09 | 28-Mar-10 | 4,207,960.00 QR |
915 | Doha Expressway (Package 1 & 2) at 22nd February Street and Al Amir Street Upgrade and Interchanges | PWA | 12-Sep-09 | 25-Dec-09 | 2,500,000.00 QR |
914 | Contract No. GC09103600 - Road Work Construction at Various Locations within Gas Operations Areas (GC09103600) | QATAR PETROLEUM | 15-Nov-09 | 14-Jul-12 | 84,990,000.00 QR |
913 | Execution of Remaining Works for Doha Expressway (Package 1 & 2) at 22nd February Street and Al Amir Street Upgrade and Interchanges (PART -3) | PWA | 1-Nov-09 | 20-Sep-10 | 57,135,390.00 QR |
912 | Road Improvement Works in Muaither West Area [RA 09-10 C 070 G]- PWA/GTC/015/2009-2010 | PWA | 15-Nov-09 | 23-Nov-12 | 26,667,640.00 QR |
911 | Road Improvement Works - Construction of Roundabout at Ummsaed Wakrah Road Near Jabel Anter (PWA/ITC/008/2009-2010) Project Code : (RA 09-10 C001 I) - PWA/GTC/020/2009/2010 | PWA | 4-Oct-09 | 13-Jun-10 | 6,300,000.00 QR |
910 | Execution of Remaining Works for Doha Expressway (Package 1 & 2) at 22nd February Street and Al Amir Street Upgrade and Interchanges (PART -2) | PWA | 1-Nov-09 | 1-Feb-11 | 89,912,932.00 QR |
909 | ERC 1400/D20/C2 Industrial Interchange Doha Expressway - Package 3 [For Waterworks, Surface Water & Drainage & Sever Works] | KONSTRUKTOR- ENGINEERING D.D. | 5-Sep-09 | 25-Mar-11 | 32,498,927.00 QR |
908 | ERM 1023C3 - Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar Contract 3 [Project Code: AMA 08-09 M 003 G] | PWA | 15-Sep-09 | 30-Mar-11 | 28,449,025.00 QR |
906 | Car Parking at Administration Building Premises | QATAR UNIVERSITY | 15.07.09 | 27.07.2010 | 8,600,000.00 QR |
905 | Mowasalat Staff Accommodation - Package II - Road Works & Road Markings | AL SRAIYA TRADING & CONTRACTING CO. | 5-Apr-09 | 1-Oct-09 | 14,870,881.00 QR |
904 | Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar Contract 1 [Project Code : AMA 08-09 M 001G] - PWA/GTC/021/2008-2009 | PWA | 5-Mar-09 | 12-Mar-10 | 37,321,600.00 QR |
903 | Doha West Sewage Treatment Works Ext. No. 3 - Road Works | GULF TRADING | 15-Jan-09 | 15-Jun-09 | 10,375,095.00 QR |
902 | ABM Military College Package -2 [Asphalt Work] | JANA TRADING CONTRACTING & TRANSPORTATION | 1-Feb-09 | N/A | 9,198,060.20 QR |
901 | Construction of Car Parking at Swimming Pool Premises | QATAR UNIVERSITY | 22-Feb-09 | 24-Apr-09 | 1,937,467.37 QR |
825 | Extension of Distribution Network at Doha Vicinity - Phase II - GTC 229/2008 | KAHRAMAA | 29-Oct-08 | 30-Apr-11 | 414,576,558.57 QR |
824 | Call off contract for Road Crossing and Reinstatement Works in Roadways and Pavements - GTC/209/2008 | KAHRAMAA | 23-Aug-08 | 23-Feb-11 | 5,562,000.00 QR |
823 | Contract for Construction of Asphalt Road for Slag Dumping Platform and GASAL Road Near NG Station - CON-TDR-132/02/2008 | QATAR STEEL | 1-Sep-08 | 15-Apr-09 | 3,262,934.00 QR |
822 | Road Works for "L" Shape Road Phase 1 A | QATAR UNIVERSITY | 1-Sep-08 | 14-Mar-09 | 10,497,836.00 QR |
821 | Miscellaneous External Services, Road Marking and Sign Board Services at Ras Laffan Industrial city - GC 08100100 | QATAR PETROLEUM | 1-Jul-08 | 17-Jul-13 | 11,472,900.00 QR |
820 | Doha Urban Pipeline Relocation Project - GTC 06/200/ED | PUNJ LYOYD | 25-Jun-08 | N/A | 6,799,040.00 QR |
819 | Salwa International Highway - ITS Ducts | TRAFFIC TECH | 19-Jun-08 | N/A | 7,585,400.00 QR |
818 | Barwa Al Khor Development Project, Site Grading Works - Phase - 1.Contract No. B003/CON-BAK/08 | BARWA AL KHOR | 16.06.08 | 28.02.2009 | 81,500,000.00 QR |
817 | Conference Road Construction - ERC/1400/D3/C1 - West Bay Zone 33 & 60 - 68, Roads Works and Infrastructure - Tower Zone - 60 North | PWA | 19-Jun-08 | 25-Jun-09 | 19,000,000.00 QR |
816 | GSE Road Widening at Doha International Airport | QATAR AIRWAYS | 6-Feb-08 | 12-Jul-08 | 24,521,454.00 QR |
815 | Asphalt Road Works at Ras Gas Common Offplot Project Ras Laffan - Qatar | NASSER S. AL-HAJIRI CO. | 4-May-08 | N/A | 11,372,179.00 QR |
814 | Two [2] Years Call-off Contract for Reinstatement Works in Roadways and Pavements at Various Location- GTC 174/2007 | KAHRAMAA | 21-May-08 | 20-May-10 | 7,515,450.00 QR |
812 | Supply & Lay of Asphalt Materials | MEMAR TRADING | 23-Mar-08 | N/A | 24,915,370.00 QR |
811 | Reconstruction, Rehabilitation & Maintenance of Roads within Northern Area - RA07-08 M004G- PWA/GTC/049/2007-2008 | PWA | 9-Mar-08 | 31-Dec-09 | 20,066,725.00 QR |
810 | RIW in Muaither Major Roads Remaining Works - RA-07-08 C 031G - PWA/GTC/024/2007-2008 | PWA | 15-Jun-08 | 14-Jul-09 | 10,122,347.00 QR |
809 | RIW in Doha South RA 07/08 C 046G - PWA/GTC/041/2007-2008 | PWA | 10-Feb-08 | 30-Jul-09 | 24,344,040.00 QR |
808 | RIW In Doha North RA 07/08 C 047G -PWA/GTC/038/2007-2008 | PWA | 10-Feb-08 | 21-Jul-09 | 13,825,200.00 QR |
806 | RIW Out of Greater Doha Zones 72, 73 & From 80 To 86 RA/07/08/C044 G - PWA/GTC/037/2007-2008 | PWA | 10-Feb-08 | 24-May-09 | 7,974,450.00 QR |
805 | Reconstruction, Rehabilitation & Maintenance of Roads within Rayyan Municipality Area - ERM 1022C2 - RA07-08M 002G - PWA/GTC/035/07-08 | PWA | 29-Jan-08 | 30-May-09 | 14,252,125.00 QR |
804 | Rehabilitation Work - Section of Ring Road | QATAR UNIVERSITY | 22-Jan-08 | 30-Nov-08 | 8,800,000.00 QR |
803 | RIW in Khor Municipality Zone 74 & 75 (RA 07-08 C 030 G) - PQA/GTC/019/2007-08 | PWA | 10-Dec-07 | 10-May-09 | 11,869,400.00 QR |
802 | RIW in Al Wakrah Municipality Zone 90 (RA 07-08 C 029 G) - PWA/GTC/020/2007-08 | PWA | 10-Dec-07 | 17-Feb-09 | 6,990,000.00 QR |
801 | [Limited] Reconstruction, Rehabilitation and Maintenance of Roads Throughout Qatar RS/07-08M 005 G - PWA/GTC/033/2007-08 | PWA | 4-Dec-07 | 15-Apr-09 | 9,847,875.00 QR |
703 | Salwa International Highway Project - Completion of Package One Works (13+225 to 30 + 000) | PWA | 18-Apr-07 | 21-Feb-09 | 261,516,670.00 QR |
702 | Construction of the remaining Works for Crushed Stone Import Facilities Roads & Bridges - Mesaieed- GTC/06/195/ED | AL HUDA ENGINEERING | 11-Apr-07 | 31-Dec-07 | 14,000,000.00 QR |
701 | UMRM Maintenance Contract 2006 - 2007 Umm Salal Municipality (Zone 71) [2007-2006/59] | M.M.A.A | 12-Feb-07 | 7-Jan-08 | 6,564,700.00 QR |
614 | ERM 1021/C5 - Reconstruction, Rehabilitation and Maintenance of Roads within Industrial Area - PWA/GTC/026/06-07 | PWA | 20-Dec-06 | 15-Feb-08 | - QR |
613 | ERM 1021/C4 - Reconstruction, Rehabilitation and Maintenance of Roads within Northern Area - PWA/GTC/025/06-07 | PWA | 20-Dec-06 | 31-Dec-07 | - QR |
612 | ERM 1021/C3 - Reconstruction, Rehabilitation and Maintenance of Roads within Wakrah Municipality Area - PWA/GTC/024/06-07 | PWA | 20-Dec-06 | 31-Mar-08 | - QR |
611 | Road Maintenance Contract - Al Daayen Municipality (Zone70; 74) - TMRM2006/C1 - | M.M.A.A | 1-Feb-07 | 31-Jan-08 | - QR |
610 | Provision of Water Network at Doha & South Qatar Areas - Phase 1 - GTC 127/2006 | KAHRAMAA | 18-Sep-06 | 20-Dec-09 | - QR |
609 | Provision of Water Network at Doha & North Qatar Areas - Phase 1 - GTC 115/2006 | KAHRAMAA | 21-Aug-06 | 29-Mar-10 | - QR |
608 | Asphalt Paving Works for Ministry of Interior at Various Locations ED-594-A | MINISTRY OF INTERIOR | 1-Nov-06 | 31-Oct-07 | - QR |
606 | Reconstruction Rehabilitation and Maintenance of Roads within Doha Municipality Area - ERM 1021/C1 | PWA | 4-Sep-06 | 28-Oct-07 | - QR |
605 | Reconstruciton, Rehabilitation and Maintenance of Roads within Rayyan Municipality Area - ERM 1021/C2 | PWA | 4-Sep-06 | 15-Apr-08 | - QR |
604 | Construction of Roads at Qatar University - Tender No. 1/2006/2007 | QATAR UNIVERISTY | 25-Oct-07 | 13-Feb-08 | - QR |
603 | Development of Roads in Zone 40 (Packages 2, 3 & 6) - ERC 1400/D6/C1 & C2 | PWA | 27-Jul-06 | 5-Mar-09 | - QR |
602 | ERC 1400/D6/C3 - Development of Roads in Zone 41 (Package 4) PWA/GTC/108/2005-2006 | PWA | 20-Aug-06 | 13-Feb-08 | - QR |
601 | Replacement of Water Distribution Mains at Doha & Mesaieed Industrial City- GTC 69/2005 | KAHRAMAA | 2-Jan-06 | 31-Jul-08 | - QR |
601 | Replacement of Water Distribution Mains at Doha & Mesaieed Industrial City - GTC 69/2005 | KAHRAMAA | 2-Jan-06 | 31-Jul-08 | - QR |
513 | The Sport City Project, Temporary Parking Facilities - KSCDC/308/05 | KSCDC | 24-Dec-05 | 26.10.06 | - QR |
513 | The Sport City Project, Temporary Parking Facilities KSCDC/308/05 | KSCDC | 24-Dec-05 | 26-Oct-06 | - QR |
512 | Call off agreement for the construction of Parking Areas at various locations - DAGOC/GTC/VN/090/2005 | DAGOC | 27-Nov-05 | 31-Jan-07 | - QR |
511 | ERM 1020C2 Reconstruction, Rehabilitation & Maintenance of Roads within Rayyan Municipality - PWA/GTC/03/05-06 | PWA | 16-Oct-05 | 11-Aug-06 | - QR |
510 | ERM 1020C2 Reconstruction, Rehabilitation & Maintenance of Roads within Doha Municipality - PWA/GTC/03/05-06 | PWA | 25-Sep-05 | 4-Sep-06 | - QR |
509 | ERC 0624 C5 - Improvement works for Rayyan Municipality Phase II - RIW Amir & Muraikh - PWA/GTC/046/05-06 | PWA | 2-Oct-05 | 1-Oct-06 | - QR |
508 | Road Maintenance Contract Wakrah Municipality (Zones 90, 91) - WMRM 2005/C1 | MINISTRY OF FINANCE | 1-Oct-05 | 5-Jun-06 | - QR |
506 | Road Maintenance - (Zones 75, 76) - Contract 2 - KMRM 2005/C2 | MINISTRY OF FINANCE | 10-Oct-05 | 20-Feb-07 | - QR |
505 | Road Maintenance - Al Khor City - Contract 1 - KMRM 2005/C1 | MINISTRY OF FINANCE | 10-Oct-05 | 20-Jan-07 | - QR |
504 | Reconstruction, Rehabiliatation & Maintenance of Roads throughout QatarERM 1020/C4 | PWA | 28-Aug-05 | 22-Aug-06 | - QR |
503 | NDIA - Labour Compound Infrastructure | AL-JABER ENGINEERING | 2-Aug-05 | 31-Jan-06 | - QR |
502 | Suhaim Bin Hamad Street & Al Shura Roundabout- PWA/GTC/022/2004-2005 - ERC 0656/C1 | PWA | 17-Jul-05 | 20-Sep-06 | - QR |
502 | Suhaim Bin Hamad Street & Al Shura Roundabout- PWA/GTC/022/2004-2005 - ERC 0656/C1 | PWA | 17-Jul-05 | 20-Sep-06 | - QR |
501 | Earthworks at Musaimeer Area (Zone 46 & 56) PWA / GTC/005/2004-2005: ERC 0684/C15 | PWA | 22-Feb-05 | 4-Dec-05 | - QR |
418 | Qatar Foundation - Education City Construction of Housing Lot # 2 - Fill Materials | MIDMAC CONTRACO JV | 27-Nov-04 | 4-Sep-04 | - QR |
417 | Widening of Jabel Road, kerbing to production Lab & pave car park for ELS Married Accommodation (Phase 1 & II) in Dukhan Fields - LTC/016/04 | Q.P | 25-Aug-04 | 15-Jun-05 | - QR |
416 | QP Dukhan Head Quarter Building Dukhan - Road + Paving Works | AL MUFTAH | 2-Aug-04 | 31-Jul-05 | - QR |
415-B | RIW Access Rds. to Houses in Umm Salal- ERC 0694 C1 | PWA | 12-Mar-02 | 30-Apr-05 | - QR |
415-A | RIW Umm Salal Municipality (Zone 70&71) LTC/184/2003-2004 - ERC0729C1 | PWA | 1-Nov-04 | 31-Jan-07 | - QR |
413 | RIW Village Roads CTC/183/2003-2004 - ERC 0728/C1 | PWA | 1-Dec-04 | 29-May-07 | - QR |
410 | ERM 1019C5 Road Maintenance 2003/2004 - Contract 5 | PWA | 15-Aug-04 | 28-Sep-06 | - QR |
409 | Underpass and Access Roads - Doha 2006 Asian Games Athletes' Village / Hamad Medical City | AL-JABER ENGINEERING | 1-May-04 | N/A | - QR |
J/19/02 | Hard Landscaping Work for Shopping Mall (Giant Store) for Qatar Central Markets | REDCO | 17-Aug-02 | 13-Dec-02 | - QR |
J/18/02 | Maintenance to Various Schools - Package (C) - Asphalt Works | CONTRACO | 11-Aug-02 | 25-Dec-02 | - QR |
J/17/02-A | Earth Works, Hard Landscaping & Road Works for Preparatory & Secondary School at Bani Hajar & Muaither - Gen/715/06-2001 - Road Works | LOTUS | 11-Aug-02 | 8-Dec-02 | - QR |
J/14/04 | Upgrade, Realignment & Construction of approach roads in the Dukhan Fields - GTC/227/FSD/03 | Q.P. | 2-Dec-03 | 30-Nov-04 | - QR |
J/14/02 | Waste Management Facility at Ras Laffan | AL-JABER ENGINEERING | 7-May-02 | 15-Dec-02 | - QR |
J/14/00 "D" | Minor Maintenance 1999-2000 - Contract 1 General Highway Maintenance Work - ERM 1014 C1 | M.M.A.A. | 1-Jul-00 | 15-Nov-00 | - QR |
J/12/04 | New Doha Int'l Airport - Site Mobilization Offices & Facilities | GULF HOUSING | 11-Jul-04 | 12-Dec-04 | - QR |
J/12/03 | Construction and Upgrade of Track Roads for the Maintenance of 33Kv Overhead Lines within the Dukhan Fields - LTC/386/02 | QATAR PETROLEUM | 24-Aug-03 | 31-Dec-03 | - QR |
J/11/04 | EPIC of Crushed Stone Import Facilities at Mesaieed Road Works & Other Services- GTC 179/ED/01 | GANDI LAVORI FINCOSIT MIDDLE EAST WLL | 1-Apr-03 | 3-Dec-04 | - QR |
J/11/02 | EPIC of 30" Khulf Gas Pipeline Replacement Project Point N-B-S - GTC 104/2000 | MEDGULF CONSTRUCTION CO. | 23-Jan-02 | 30-Sep-02 | - QR |
J/10/03 | Repair of existing Well Head Track Road & Construction of New Layouts in Dukhan Fields - GTC/154/FSD/02 | AL-JABER ENGINEERING | 1-Jan-03 | 28-Jul-03 | - QR |
J/10/02 | Road Track Repair at Dukhan - GTC 143/2002 | Q.G.P.C. | 1-Jan-01 | 1-Aug-02 | - QR |
J/09/97 | Road Works at P205-R-3210-002-Camp Building at Ras Laffan | CONSTRUCTION DEVELOPMENT CO. | 8-Jan-97 | 16-Mar-98 | - QR |
J/09/02-A | Warkrah North - Asphalt Works - ERC 409 - RIW | AL SRAIYA TRADING & CONTRACTING CO. | 1-Jan-02 | 28-Jul-02 | - QR |
J/08/99 | RAF 'B' Distillate Mains, MEW Ref: PPW/6406A, Reinstatement of Major and Minor Roads | MABANI | 23-Apr-98 | 7-Nov-99 | - QR |
J/08/96 | Shopping Mall at D ring road for Shk. Hassan Bin Sulthan Al-Thani Earth Work/Hard Landscaping | AL-AHED CONTRACTING | 26-May-96 | 18-Dec-96 | - QR |
J/08/04 | EPIC of LPG Tanks & conversion of existing 2 No. propane tanks to Butane storage tanks - Mesaieed - GTC129/ED/02 | SAMSUNG | 25-Jan-04 | 3-Dec-04 | - QR |
J/08/03 | RIW Al Wajbah Access Road to Amir Guard Army Camp - ERA 0110C7 | M.M.A.A. | 1-Jan-02 | 1-Aug-03 | - QR |
J/08/02-A | Road Maintenance 2001-2002 - Contract 6 - ERM 1016 C6 | MMAA | 1-Jan-02 | 25-Jun-02 | - QR |
J/07/04 | General Maintenance Works | VARIOUS | 1-Jan-04 | 8-Dec-04 | - QR |
J/07/02 | General Maintenance Works | VARIOUS | 1-Jan-02 | 31-Dec-02 | - QR |
J/07/01 | General Maintenance Works | VARIOUS | 1-Jan-01 | 31-Dec-01 | - QR |
J/06/04 | Call off Contract for Civil Maintenance of Roads & Track within Dukhan Fields - GTC/199/02 | Q.P. | 1-Jun-03 | 1-Dec-04 | - QR |
J/06/02-B | Wholesale Market Roads - ERC 0499 | M.M.A.A. | 7-Jan-01 | 8-May-02 | - QR |
J/06/02-A | RIW - Doha West Abu Hamour Road - ERC 0101 C2 | M.M.A.A. | 11-Oct-00 | 15-Jun-02 | - QR |
J/05/04 | Civil Works for Roads & Infrastructure - QP Hazardous Waste Treatment Centre - Mesaieed - GTC178/ED/01 | AL SARYA GROUP | 12-Nov-02 | 29-Jun-04 | - QR |
J/05/03 | General Maintenance Works | Various | 1-Jan-03 | 31-Dec-03 | - QR |
J/05/02-B | ERC 0694C1 - RIW Access Roads to Houses in Umm Salal | M.M.A.A. | 27-Jan-02 | 7-Jan-03 | - QR |
J/05/02-A | ERC 0500 C1 - RIW - Ummslala Municipality Area | M.M.A.A. | 27-Jan-01 | 18-Jul-02 | - QR |
J/05/01 | Rehabilitation of Road No. 16 Part A + B at Ummsaieed | AMCON | 12-Oct-00 | 13-Dec-01 | - QR |
J/04/03 | Road Maintenance Work at Doha- ERC0570C1 | M.M.A.A. | 1-Jan-02 | 1-Nov-03 | - QR |
J/04/02 | Access Roads to Qatar Water Factory - ERC 0561 C1 | M.M.A.A. | 27-Jan-01 | 26-May-02 | - QR |
J/04/01 | Qatar Vinyl Project - Road Works | C.C.I.C. | 1-Jan-00 | 15-Jun-01 | - QR |
J/04/00 "B" | Qatar Exhibition Centre roads - ERC 0422C1 | AL-JABER CONTRACTING | 1-Jan-99 | 20-Aug-00 | - QR |
J/04/00 "A" | Tender for ERC 0299 C8 Road Improvement works village roads N. Village | AL-JABER CONTRACTING | 1-Jan-99 | 15-Jul-00 | - QR |
J/03/02 | ERC 0496C1 - Access Roads to Rayyan Water Factory | M.M.A.A. | 20-Jan-01 | 31-Jan-02 | - QR |
J/03/01 | Asphalt Work at West Bay Hotel | C.C.I.C. | 1-Jan-00 | 1-Dec-01 | - QR |
J/03/00 | Road Improvement Works - Zone 47 "ERC 0392C2" | M.M.A.A. | 1-Jan-99 | 30-May-00 | - QR |
J/02/96 | Road works at the Qatar Flour Mill - Doha Port | AL JABER ENGINEERING | 1-Aug-96 | 1-Dec-96 | - QR |
J/02/04 | Al Diffaf St. Zone 38- ERC 0572 C1 | M.M.A.A. | 7-May-02 | 30-Jun-04 | - QR |
J/02/02-A | Road Improvement Works - Muaither North & Al Wajbah-ERA 0110C3 - | M.M.A.A. | 11-Nov-00 | 6-Jun-02 | - QR |
J/02/01 | Route 55 - Mesaieed to Salwa Road | TEYSEER CONTRACTING CO. | 6-May-00 | 12-Dec-01 | - QR |
J/01/99 | General Works | VARIOUS | 1-Jan-99 | 31-Dec-99 | - QR |
J/01/99 | Asphalt Work on the US Army Corps of Engineers FY 97 | BILL HARBERT | 1-Jan-99 | 18-Dec-99 | - QR |
J/01/98 | General Works | VARIOUS | 1-Jan-98 | 31-Dec-98 | - QR |
J/01/97 | General Works | VARIOUS | 1-Jan-97 | 31-Dec-97 | - QR |
J/01/96 | General Works | VARIOUS | 1-Jan-96 | 31-Dec-96 | - QR |
J/01/04 | ERC 0585 C2 - RIW in Al - Khor | M.M.A.A. | 1-Jun-03 | 21-Nov-04 | - QR |
J/01/00 | General Works | VARIOUS | 1-Jan-00 | 31-Dec-00 | - QR |